Skip to content
(619) 537-9408

Wildfire defensible space · Zone 0 hardscape

The first 5 feet around your home should not be able to burn.

We replace bark mulch and planting beds next to your house with concrete, gravel, or pavers, built to drain away from your foundation.

Free site visit · Fixed price quote

Get a free Zone 0 quote

We text you a confirmation immediately. Ronnie calls back as soon as he can.

CSLB License #1130763: C-8 Concrete · Veteran Owned · Fully Insured

  • Licensed

    CSLB License #1130763: C-8 Concrete

  • Veteran Owned

    Veteran Owned

  • Insured

    Fully Insured

  • In House

    In House Crew

The basics

What Zone 0 is

Zone 0 is the first 5 feet out from the outside walls of your home, or from the outer edge of an attached deck, stairway, or pergola.

California is finalizing a rule to keep that strip free of things that burn, so embers landing next to the house have nothing to catch. On November 5, 2026 the State Board of Forestry and Fire Protection adopted revised emergency Zone 0 regulations. They still need approval by the Office of Administrative Law, so they are not in effect yet.

Once final, the rule would apply in State Responsibility Areas and in Very High Fire Hazard Severity Zones in local areas. Properties outside those zones are not covered.

Rule status last checked: November 15, 2026. Adopted by the state board, not yet in effect.

Check your address

Is my home in a fire hazard zone?

The state keeps a map of fire hazard severity zones and responsibility areas. Type in your address to see which zone your home is in.

Look up your address on the state map

Not sure what the result means? Send us the address and we will look at it with you during the free site visit.

Concrete hardscape

What we install

  • Concrete perimeter bands along the house
  • Gravel or decomposed granite hardscape strips held by concrete or steel edging
  • Paver or concrete side yard walkways
  • Removal and haul off of bark mulch and planting beds
  • Drainage grading so water runs away from the foundation

Under the adopted text

What has to come out of the first 5 feet

Comes out

  • Bark and wood chip mulch
  • Firewood
  • Fallen leaves and needles
  • Other combustible items
  • Anything combustible under decks, balconies, or stairs
  • Plants under the eaves
  • Plants within 2 feet of windows, doors, and vents

Can stay

  • Concrete, gravel, pavers, and other materials that cannot burn
  • Low, non woody plants away from the eaves, windows, doors, and vents, within size and spacing limits
  • A noncombustible patio surface (it does not extend the zone)

How it works

Five steps, start to finish

  1. 1

    Free site visit

    We walk the first 5 feet around your home with you and measure what needs to change.

  2. 2

    Fixed price quote

    You get one fixed price for the whole job, written out line by line.

  3. 3

    We remove the mulch and beds

    We pull out the bark mulch and planting beds next to the house and haul them away.

  4. 4

    We install

    We pour, place, and edge the new surface, sloped so water drains away from your foundation.

  5. 5

    Final walkthrough

    We walk the finished strip with you and make sure everything drains and looks right.

Our work

Side yards, perimeter concrete and drainage

  • New concrete walkway running along the side of a stucco house with a gravel yard on both sides

    San Diego

  • Freshly poured broom finished concrete filling a long side yard right up to the house wall

    San Diego

  • Channel drain set along the house wall at a downspout before the concrete pour, to carry water away from the foundation

    Chula Vista

  • Finished concrete against the house wall with a channel drain at the downspout

    Chula Vista

  • Trench drain grate set in a trench beside a stucco wall, ready for concrete on both sides

    Chula Vista

  • New broom finished concrete covering the ground beside the house, with sawcut control joints

    San Diego

  • New concrete poured against the back wall of a house with a step at the door

    San Diego

  • Long new concrete walkway with sawcut joints running between hedges and planting

    San Diego

  • New concrete wrapping the corner of a stucco house, replacing the dirt next to the walls

    San Diego

  • Narrow side yard concrete path poured along the side of a house

    San Diego

  • New concrete walkway beside a house with a river rock border

    San Diego

Timing

Why do it now

Fire agencies already recommend replacing wood chip mulch next to the home with gravel or another noncombustible option now, before any rule is final.

Under the adopted text, new construction complies when the rule takes effect, and existing homes phase in, with most ground level changes due three to five years after the effective date. Planning the work now lets you pick the timing and the materials.

★★★★★ 4.95 Average · 164 Google Reviews

What our customers say

  • ★★★★★
    “Ronnie was Excellent and his team as well. We needed some concrete repair and also our driveway repaired. He was super professional! I highly recommend Rose Concrete and development! Thanks again Ronnie!”

    Charles H. · Google review · Nov 2026

  • ★★★★★
    “Rose Concrete met and exceeded my expectations. They were punctual, courteous and did not exceed their initial budget. I highly recommend Rose Concrete.”

    James H. · Google review · Oct 2026

  • ★★★★★
    “Highly recommend Rose Concrete! Even though I wasn't thrilled about having to fix a city sidewalk, the team made it as painless as possible. They were friendly, super professional, finished the job quickly, and charged a very fair price. The work looks great. Definitely recommend!”

    Ronald Y. · Google review · Jul 2026

Questions

Zone 0 FAQ

  • What is Zone 0?

    The strip within 5 feet of your home. California is finalizing a rule to keep that strip free of things that burn.

  • Is Zone 0 the law right now?

    Not yet. The state board adopted the rule on November 5, 2026 and it is waiting on final legal approval.

  • Does it apply to my house?

    Only in state fire responsibility areas and Very High Fire Hazard Severity Zones. Use the state lookup to check your address.

  • Do I have to remove all my plants?

    No. Low, non woody plants are allowed with spacing limits, but not under eaves or close to windows, doors, and vents.

  • What can go in the first 5 feet?

    Concrete, gravel, pavers, and other materials that cannot burn.

  • How long will I have to comply?

    Under the adopted text, existing homes phase in over three to five years after the rule takes effect.

  • Will this lower my insurance?

    We cannot promise that. Ask your insurer what they credit.

  • Will concrete next to my house cause drainage problems?

    Not when it is built right. We slope it away from the foundation.

Start with a free site visit.

Fixed price quote after a free site visit. Licensed C-8 concrete contractor, CSLB #1130763.

Or call (619) 537-9408.

Official source: State Board of Forestry and Fire Protection, Defensible Space Zones 0, 1 and 2. Rose Concrete is an independent licensed contractor, not part of or endorsed by any agency.